The integrated control safety system (ICSS) at the Total E&P gas processing plant required an extensive renovation as it was based on Contrôle Bailey Alspa-ZS systems dating back to the mid eighties. A new gas processing unit was to be put in service in 2005, requiring a new process control system and safety controllers. It was then decided to use this opportunity to launch a major renewal of the complete ICSS covering the entire plant.
In this case, we supplied Ex cable glands Glakor with Atex certification, specially designed for hazardous areas and for zone 1, 2, 21 and 22
The integrated control safety system (ICSS) at the Total E&P gas processing plant required an extensive renovation as it was based on Contrôle Bailey Alspa-ZS systems dating back to the mid eighties. A new gas processing unit was to be put in service in 2005, requiring a new process control system and safety controllers. It was then decided to use this opportunity to launch a major renewal of the complete ICSS covering the entire plant.
In this case, we supplied Ex cable glands Glakor with Atex certification, specially designed for hazardous areas and for zone 1, 2, 21 and 22
From the need to the solution.
This is how we turn every project into a success story.
talk to our
experts
Our team of engineers and consultants is at your disposal to analyze your project in depth and propose the most suitable, efficient and aligned alternative.
We put engineering at the service of your challenges.